Well being half term Taylor and I decided we would have a go at a few jobs which had been long overdue on both cars. The list consisted of -
On mine,
Fitting new brake lines to the front, along with discs and pads.
Fitting my fog lights (thanks to Taylor)
Oil and filter change
Then for Taylors,
Remove and fit PAS removal kit although we had a few problems and had to loop it in the end
Adjust timing
Remove misfire which was done via timing and a set of BKR6E-11 NGK spark plugs along with many other little jobs and a trip to pub!
After Taylor's last expericences with both a hammer and knife I thought it was best we took the save option this time and used and angle grinder to fit the fog lights! :lol:
Once they were fitted we rolled it off the drive as i had drained the oil at this point.